Sign In | Join Free | My hardware-wholesale.com |
|
Brand Name : Ruideer
Model Number : 530L
Certification : GB150, JB4732
Place of Origin : China
MOQ : 1 set
Price : USD1200000.00-20000000.00
Payment Terms : T/T
Supply Ability : 3 sets
Delivery Time : 5-8 months
Packaging Details : Special wooden box
Reaction chamber : 2 pcs
Maximum temperature : 1100℃
Working temperature : 900-1050°C
Total power : about 75KW
Heating power : about 55KW
Effective size of reaction chamber : φ500mm×1500 mm;
1. Assembly Group
The CVD coating furnace consists of six parts: workbench, reaction chamber, heating cover, cooling cover, rail crane, condenser.
The major systems are cooling water system, pump system, gas tube&pipeline system, aerodynamic system and electrical control system.
2. Factory working environment
2.1 Ambient humidity and temperature
2.1.1 Ambient humidity: <90% (at +35°C)
2.1.2 Ambient temperature: 5℃~40℃
2.2 Power supply
2.2.1 Power supply: 380V±10%, 50Hz, three-phase five-wire system
2.2.2 Control power supply: 210V~250V, 50Hz, single phase
2.3 Air source
2.3.1 Compressed air pressure: 6-7bar,
2.3.2 Ar pressure: 2-3bar,
2.3.3 H2 pressure and flow: 2-3bar, 0-75slm
2.3.4 N2 pressure and flow: 2-3bar, 0-50slm
2.3.5 CO pressure and flow: 2-3bar, 0-2.5slm
2.3.6 CO2 pressure and flow: 2-3bar, 0-5slm
2.3.7 CH4 pressure and flow: 2-3bar, 0-5slm
2.3.8 HCl pressure and flow: 2-3bar, 0-5slm
2.3.9 H2S pressure and flow: 2-3bar, 0-0.4slm
2.4 Water source
2.4.1 Cooling water inlet pressure: 2-3bar, pure water is recommended. The temperature is 13-16°C. (Customers need to be equipped with chilled water), cooling water flow, 5m3/h.
2.4.2 Emergency standby water source (to be prepared by the user)
Pressure: 1.5bar—2bar.
![]() |
Gold Black Layer CVD Coating Machine For CNC Carbide Tools Coating Service Images |